"Good" Add-On Shower
(Part Number EB)

Clawfoot Alley recommends that you hire a qualified plumber to install the components of your clawfoot tub. This is the best way to ensure correct, professional installation.1. Turn off water supply.
2. Unthread faucet locknuts and supply coupling nuts from your present tub faucet. Remove faucet from tub.
3. Apply a bead of plumbers putty around the tub faucet supply holes.
4. Place new tub faucet (A) into position. Attach locknuts (B) to threaded shanks and tighten.
5. Reconnect existing supply hose pieces into faucet shanks. Tighten coupling nuts securely.
6. Slide (5-way) wall support tee (K) onto upper riser (E).
7. Thread upper riser (E) to lower section (H), Thread shower head to upper riser (E) using Teflon tape.
8. Line up assembled riser with connector nut (J).
9. Thread riser connector nut (J) onto riser pipe using Teflon tape.
10. Locate (5-way) wall support tee (K) 8 ft. 3 in. from inside bottom of tub.
11. Cut wall support rod (short tube) (L) to a length equal to the tee (K) to wall measurement plus 1/4 in.
12. Thread support rod (L) into tee (K). Slide flange (M) onto support rod and mark location of set screw hole on support rod. Remove flange and drill a 5/32" hole where location mark was placed. Slide flange back onto support rod and tighten set screw. Position flange flush against wall and mark screw holes.
13. Fasten flange (M) to wall with wood screws provided. Tighten set screw.
14. Slide curtain frame sections (N) onto wall support tee (K). Align set screw holes on tee and curtain frame. Tighten set screws.
15. Slide curtain frame sections (N) onto ceiling support tee (P). Make sure support rod hole points to the ceiling. Align set screw holes
m tee and curtain frame. Tighten set screws.
16. Cut ceiling support rod (Q) to a length equal to the clip (P) to ceiiing measurement plus 1/4 in.
17. Insert clip (P) half into a tube end by squeezing (use pliers). Assemble rod (Q) with hanging ring and put it onto tube. Then insert the rest half clip into the end of another tube. Slide flange (R) onto support rod and mark location of set screw hole on support rod. Remove flange and drill a 5/32" hole where location mark was placed. Slide flange back onto support rod and tighten set screw. Position flange flush against ceiling and mark screw hole.
18. Fasten flange (R) to coiling with wood screws provided. Tighten set screw.
19. Turn on water.